Pine Street Sewer and Water Main Project
Pine Street
Current Status: Design

Upcoming Events:  New Concept Hearing, April 3, 2014@ 7:00 PM in the Town Room at Town Hall.  See the new conceptual drawings below

Project Scope: This project will involve upgrades to the water,sewer,sidewalks,road and the addition of bike lanes, from Bridge Street to North Pleasant Street.

Comments: Comments on this project can be sent to , and will be posted on this page.

Pine Street Path Options vs Sidewalk Options (3/5/2013)

Multi Use Path Dwg. #1  

Multi Use Path Dwg. #2

Multi Use Path Dwg. #3

Multi Use Path Dwg. #4

Multi Use Path Dwg. #5

Cushman National Historic Register

Cushman Village Zoning

       
Conceptual Layout Bridge/Pine Street Roundabout 1/23/13

Conceptual Layout Bridge/Pine Street Intersection Option - One Way 1/23/13

PWC Minutes July 2012 and September 2012 (These minutes have discussions pertaining to this project)


Conceptual Street Layout #1

Conceptual Street Layout #2

Conceptual Street Layout #3

Conceptual Street Layout #4

Conceptual Street Layout #5

Conceptual Street Layout #6 - Intersection Options

Conceptual Street Layout #7

Conceptual Street Layout #8

Conceptual Street Layout #9

Cross Sections Sheet #10